Client: AMCO

Date: December 2017

Value: £154K

 

In April 2017 Lineside were engaged by AMCO to undertake tunnel lining repair works in Kilsby Tunnel, a Railway Tunnel 1.5 miles in length. The works required have been both standard repairs and preventative measures including Re-pointing, Re-casing, Portal De-vegetation and the replacement of down pipes and flashings. In addition we were required to remove and replace Filon sheeting. Works were undertaken during night possessions.