Disley Tunnel

Client: MPB Structures Ltd

Client:MPB Structures Ltd
Date: Completed September 2016
Value: £240K

In April 2016 Lineside were engaged by MPB to undertake repair works in Disley Tunnel, a Railway Tunnel 2.6 miles in length. The works included Re-pointing, Re-casing and the provision and fixing of limited clearance plates. Works were undertaken during night possessions and a Gator was utilised for the duration of the works.